This large block consists of 22 flats.
The existing technical room contained a methane boiler that generated a total power of 175kW for heating only. Separate boilers were used to produce DHW.
E.GEO has installed a geothermal system for the heating function only. 60kW of geothermal energy are generated by one WBT 60G (manufactured by Teon) fed by twelve 100m deep geothermal probes.