Condominio Via Corinaldo

Ancona (Italy)
60kW

This large block consists of 22 flats.

The existing technical room contained a methane boiler that generated a total power of 175kW for heating only. Separate boilers were used to produce DHW.


E.GEO has installed a geothermal system for the heating function only. 60kW of geothermal energy are generated by one WBT 60G (manufactured by Teon) fed by twelve 100m deep geothermal probes.


Before

After

BACK TO PROJECTS
menuarrow-right
en_GB