YKK

Ascoli Piceno (Italy)
700kW

System serving the YKK production plant in Ascoli Piceno (Italy). In the context of decarbonisation and YKK's corporate environment and energy goals, the replacement of a gas boiler with a capacity of approx. 700 kW was necessary. The new equipment also offers a cooling function, that was not available before the replacement. 


E.GEO is constructing the multi-source geothermal plant for 700kW of geothermal energy generated by one WBT 350A heat pump (manufactured by Teon), fed by a set of dry coolers and one WBT 350W heat pump, fed by three intake wells and three return wells. 

This results in a cost reduction of approx. 50%/year for the needs satisfied by the system. The estimated savings amount to €45,000-50,000 /year, including the new cooling function, which did not exist before the intervention. The E.GEO system allows to replace a total annual consumption of 50,000 m3 - 55,000 m3 of fuel gas on average with about 125,000 kWh electricity/year, with a reduction in CO2 equivalent emissions of about 74%.


BACK TO PROJECTS
menuarrow-right
en_GB